Innovative Automation and Boiler Control Systems
10x10.gif (821 bytes)
Contact Us Why G.R. Bowler? Welcome
navright.gif (405 bytes)
G.R. Bowler, Inc.: Automation and Boiler Control Systems
nav-top.gif (3435 bytes)
pix-1x12.gif (52 bytes)
Industrial Controls
Marine Controls
Services
Parts & Equipment
Why Automate?
Featured Projects
nav-bottom.gif (1436 bytes)

Industrial Control Systems

When it comes to innovative industrial boiler control systems, the G.R. Bowler record speaks for itself. Here are some samples of our work:

Mt. Tom

Owned by Northeast Generation Services located in Mt. Tom, Massachusetts. Outdated PLC-based burner management system was fraught with failures.

Visy Paper

Located in Staten Island, New York, the Visy Paper plant turned to G.R. Bowler to optimize their existing system for lower N0x  emissions. 

Foster Wheeler

Foster Wheeler Development Corporation’s Combustion and Environmental Test Facility (CETF) in Dansville, New York, contracted G.R. Bowler Company to install and configure an integrated APACS® combustion control system and QUADLOG burner management system (BMS).
 

Marine Control Systems

G.R. Bowler is a pioneer in marine control systems. In 1986 we installed the first microprocessor-based automatic boiler control system aboard a U.S. flagged vessel. In 2000 we created the first automation of a Great Lakes ACC Class Steam Ship.

G.R. Bowler has helped bring innovative automation control systems to life for the world’s premier military and commercial fleets. Our record speaks for itself. Here are some samples:

S.S. Badger

Lake Michigan Carferry has been awarded a $75,000 grant from the Wisconsin State Energy Office to begin the engineering work for converting the S.S. Badger from coal to LNG, and has enlisted
G.R. Bowler to help. The S.S. Badger will be the first steam ship in the USA to refuel with LNG.

Cason J. Callaway

The USS/Great Lakes Fleet needed a new, more economical system for its Cason J. Callaway steam plant. G.R. Bowler provided innovative engine room management. 

SS Ocean Phoenix

Premier Pacific required modern boiler control systems with the flexibility to efficiently burn any of three different grades of fuel. G.R. Bowler installed them. 

The LNG/C Matthew

Cabot LNG, Inc. needed safety, reliability, and twenty years of serviceability for its automation upgrade of all ship systems for the LNG/C Matthew. G.R. Bowler supplied them. 
   


G.R. BOWLER
Welcome
Why G.R. Bowler?
Why Automate?
Featured Projects
Contact Us

PARTS/EQUIPMENT
Chandler Services
Detailed RFQ
FAQ


SPECIALTIES
Marine Controls
Industrial Controls

SERVICES
Overview
Process & Automation Control
Control System Migration
Emissions Reduction
Emissions Compliance & Reporting
Fuel Measuring Systems

 


<a href="https://secure.blueoctane.net/forms/I19Y5FV3HDWB">Click Here To Load This Formexperts.com Form</a>

   
Welcome | Marine Control Systems | Industrial Control Systems | Services | Parts and Equipment | Why Automate | Featured Projects
 
topspacer.gif (818 bytes)
© 2015 G.R. Bowler, Inc. All rights Reserved